Estonia (EE) bidding zone
Estonia synchronised with the Continental European grid in February 2025, together with Latvia and Lithuania, ending decades of operation in the BRELL ring with Russia and Belarus. It connects to Finland by subsea HVDC.
Reference data
- Zone code
- EE
- Name
- Estonia
- Country
- EE
- Region
- Baltics
- ENTSO-E EIC
- 10Y1001A1001A39I
- Delivery-day timezone
- Europe/Tallinn
- Clearing currency
- EUR
The EIC is the in_Domain / out_Domain value for ENTSO-E Transparency Platform queries against this zone. Verify it against the ENTSO-E EIC registry before relying on it: several countries publish aliased bidding-zone, control-area and market-balance-area domains, and the correct one depends on what is being asked for.
What an analyst watches here
Series that cross the February 2025 synchronisation should be read with that break in mind: the system's behaviour before and after is not the same system.
Coverage
- Day-ahead prices
- Collected
- Bid curves
- Via the Nord Pool BALTIC cluster, aggregated with LV, LT
- Continuous intraday
- EPEX SIDC, 60 / 15-minute resolution
Neighbours are day-ahead coupling topology only — no capacity and no direction. They are what the reconstruction uses to derive a coupling reference price for modelled net imports, and they are not a substitute for allocated cross-zonal capacity, which is not yet ingested.